What is different about paving a drive that is still in use?
Everything that happens before the first block is laid. On an empty plot we can close the whole area and work straight through; on a drive used every day, we have to plan where the car goes, how the owner reaches the front door, where materials are stored and when the machine needs the full width. Paving technique is the same, but the organisation around it is not.
Typical cases on the Costa del Sol are villas where the owner lives full time, rented properties with guests arriving, communal drives shared by several houses and business premises that cannot stop deliveries. Each one sets a different limit on how much of the drive can be closed and for how long, and the plan starts from that limit.
How do we plan the job before starting?
With a visit, a marked photo and a short written plan that the owner approves. The visit is where we check the gate width, the slope, where a lorry can unload, whether the car can be parked on the street or elsewhere on the plot, and how water drains today. Those answers decide the phasing.
- Measure the drive and mark on a photo the sections we propose to close in turn.
- Agree where the car or cars will stay during each section.
- Choose a spot for pavers, aggregate and the skip that does not block access.
- Identify fixed levels: garage floor, door thresholds, gate and existing manholes.
- Confirm whether any municipal paperwork has been filed by the owner.
- Agree how and when we send progress photos.
The plan is part of the written quote, so it is clear from the start what to expect. If you want to see what else a quote should show, our article on what goes into a driveway quote goes through the line items.
How is the drive divided into sections?
Along natural breaks, so that each section can be finished and reopened before the next one closes. On a straight drive that might mean working from the garage towards the gate, or the other way round, depending on where the car needs to be. On a wider drive we can sometimes work one half at a time along its length, leaving a lane open.
Each section goes through the full sequence: lifting the old surface, excavation, sub-base in compacted layers, any bound layer, grit bed, laying, cutting, jointing and compaction. The joint between sections is set out so the pattern runs on without a visible seam. Edges are built before the paving in each section, so the finished part is properly restrained when it reopens.

What happens with deliveries, machinery and neighbours?
Deliveries are timed so that pavers and aggregate arrive when there is space to put them, not on the day the only open lane is needed. On narrow urbanización roads, we agree a delivery window and let neighbours or the community administrator know in advance, especially if a lorry will stop in front of other properties.
- Materials are stacked on the plot, away from the gate and the open lane.
- Machines are sized to the gate and the slope; smaller plant is used where access is tight.
- Rubble leaves in loads that do not block the road for longer than needed.
- Dust and noise are kept to working hours and to the area being worked on.
- Neighbours sharing an access road are told which days it will be busy.
If a skip or container must sit on the public road, it may need municipal permission, depending on the town hall's rules, and who requests it is agreed in the quote.
How do owners who live abroad follow the work?
Through photos at agreed stages, sent by message or email. Owners on the coast are often not on site during the works, so we send pictures at the points that matter: the excavated formation, the compacted sub-base, the set-out lines and channels, the edges, and the finished section. Those are also the stages that cannot be checked once the paving is down.
Communication is in English, and the quote and the plan are written so they can be understood without a technical background. If a caretaker, property manager or neighbour has the keys, we coordinate access with them and keep the owner copied. All six websites in this network are run by the same autónomo, so there is one point of contact from start to finish.
What questions do owners usually ask before we start?
The same handful of questions come up on almost every drive that stays in use. They are reasonable questions, and we answer them in the plan rather than leaving them to the first morning on site.
- Can I still get the car in and out every day? Usually yes, with phasing, or with the car parked nearby for the section by the gate.
- When can I drive on the new paving? Once the section is jointed and compacted we confirm when it can reopen; we do not give a general rule.
- Will the new section match the old? If only part of the drive is redone, colour and pattern matching is discussed beforehand.
- What if you find something under the old drive? We stop, send photos and agree how to proceed.
- Do I need to be there? No, as long as access and the plan are agreed.
If your garage apron is part of the job, our guide on falls and drains on driveways explains why the threshold is planned first.
How does the job finish?
With a final walk over the whole drive, a check of joints and edges, a clean of the surface and the removal of all materials and rubble. We send a set of photos of the finished drive and point out anything the owner should watch in the first weeks, such as joints settling after the first rains and needing a top-up.
Our work on everyday drives is described on driveway block paving and garage entrances. Send us a photo and the approximate m² – free, no-obligation quote. Tell us how you use the drive day to day and whether you will be on site, so the plan fits your routine.
Frequently asked questions
Can I keep using my drive while it is being paved?
In most cases partly, yes. The drive is divided into sections that are closed one at a time, and the car is parked in an agreed spot when its usual place is being worked on. On very narrow drives a short full closure may be unavoidable, and we agree it in advance.
Do I have to be at the property during the work?
No. Many owners on the coast are abroad during the works. We agree access, the phasing plan and the photo stages beforehand, and coordinate with a caretaker or manager if there is one. Photos at key stages let you follow progress from a distance.
Which stages do you photograph?
The excavated formation, the compacted sub-base, the set-out lines and drainage, the edges, and each finished section. These are the stages that cannot be inspected once the paving is down, so they are the most useful for an owner who is not present.
What happens if you find soft ground under the old drive?
We stop work on that area, send photos of what we found and explain what it means for the base. Any extra excavation or material is agreed with you before we continue. This is set out in the quote so there are no surprises about how it is handled.
Where are materials stored during the job?
On the plot, in a spot agreed during the visit, away from the gate and the lane that stays open. Deliveries are timed so pallets arrive when there is space for them. On tight plots, smaller deliveries are arranged instead of one large one.
Will the neighbours be affected?
Sometimes, mainly on delivery and rubble days on narrow roads. We agree delivery windows, inform neighbours sharing the access and keep the road clear as much as possible. In communities, we also inform the administrator so residents know in advance.
When can I drive on each finished section?
We confirm it for each section once it is laid, jointed and compacted, based on the build-up used. We do not give a general rule, because it depends on the base and on whether a bound layer was used. The plan shows when each section is expected to reopen.
Can you pave only part of the drive and leave the rest for later?
Yes. The joint between the new and old paving is set out cleanly, with matching levels and drainage planned for the whole drive. If the old paving is a different product, the change is placed at a natural break such as the gate or the garage apron.
Do you communicate in English?
Yes. Quotes, plans and progress updates can be in English, and technical terms are explained in plain language. Where a Spanish-speaking caretaker or administrator is involved, we keep both sides informed so everyone has the same information.